| “Every great achievement is the victory of a flaming heart.” - Ralph Waldo Emerson |
| |
| We have entered into the following agreements for Aster services and products as mentioned below : |
| |
Transmission & Distribution
- Received Order from PGCIL for construction of Transmission Line - 400 kV D/C Quad Salem (New) - Somanhalli -120 km on EPC basis, which is Associated with Southern Region System Strengthening- XIV 8362 m ID 3649
- Received Order from Sravanthi Infratel pvt. Ltd. for construction of 33/220 kV Substation and 220 kV D/C Transmission Line - 22 km at Ratlam, MP for the 100 MW Wind Power Project
|
 |
| |
International Business Operations
- Order of 35 Telecom Towers from Nepal
- Supply of 132 kV Substation Structures to PHCN Nigeria
- Supply of 100 nos. 33 kV Double Circuit towers to ECG Ghana
- Supply of 3,000 m2 PEB warehouse to Ghana
|
 |
| |
Heavy Structures & Projects
- Design, supply, installation, testing and commissioning of 150 m TV Tower at Mahabubnagar
|
 |
| |
Pre Engineered Buildings
- Bagged turnkey works for four Bangalore Metro station (OMR, CMH road, Bypannihalli and Ulsoor)
|
 |
| |
Heavy Engineering Division (HED)
- Bagged order for Stacker Reclaimer structures Fabrication of 6 nos.
|
|